Manual panel allocation
Panels can be manually allocated in the Performance task. Whether a project requires manual allocation depends on it's complexity, it's size and whether the system is optimised. After a system has been automatically allocated, you may also wish to make edits to the string arrangement.
Manual panel allocation
To open up the manual panel allocation, follow these steps:
- Open the Performance task
- Click
Edit inputsin the top right - Select the
Panel allocationtab - Then click
Edit allocationorAllocate panelsin the bottom left
Manually allocating panels is slightly different depending on whether the panels are optimised or not. All panels connected to an input must be within a certain pitch and orientation threshold and panels incompatible with the selected string will not be selectable. In this case the panels may need to be optimised.
With non-optimised systems
- Select inverter input and the roof you'd like to allocate from the
listslist on theleft.left - Click or drag over panels to allocate them to an inverter
input.input GoRepeattosteps 1-2 on the next inverter inputandorrepeat.roofOnceuntil allinverterpanelsinputsarehaveallocated.the correct number of panels, allAll inputs will be in green and a tick will show at thetop.top of the page- Below all your inverters and roofs, you can then click
nextNextto continue with the Performancetask.task
With optimised systems
When you come to allocating the panels the steps are largely similar to non-optimised systems:
- Select inverter input and the roof you'd like to allocate from the
listslist on the left - Click or drag over panels to allocate them to an inverter input
- If you are allocating on the same string on a different roof click
Add group +to sub-divide the input into shading groups and then select the roof you want to allocate panels to and allocate the panels ClickRepeatorstepdrag3over panels to allocate them to an inverter input or shading groupGo toon the next inverterinput orinput, shading groupandorrepeatroof Onceuntil allinverterpanelsinputsarehaveallocated.the correct number of panels, allAll inputs will be in green and a tick will show at the top of the page- Below all your inverters and roofs, you can then click
Nextto continue with theprojectPerformance task
Tip: You do not need to put each individual panel into a shading group. To best model the output of the system, group panels that will get similar levels of shade. Easy PV will also require that you use shading groups for panels that are on different facing roofs but on the same string.
❓FAQ: Why has the generation not changed after adding optimisers?
{{@242}}