Skip to main content

New in January 2026

Updates

  • Added the option to clone inverters when using multiple of the same type. Stringing is copied by default.
  • New bulk update options for all DC isolators and cables within the electrical task.
  • MCS handover document added.
  • Signature date is now auto-completed when e-signing.
  • Improved how GSE trays are specified relative to panel size. Easy PV will now always select the minimum compatible size
  • BirdBlocker clips are now specified based on panel frame width.
  • Extra BirdBlocker clips are only specified when required.

Fixes

  • Fixed issues with east-west mounting and panel allocation.
  • Corrected the system overview summary generated in the proposal when both string and hybrid inverters are selected.
  • Updated DNO form rounding to 2 decimal places (e.g. 3.68 kW no longer rounds to 3.7 kW).
  • Fixed incompatible pan tile hooks being specified for Fastensol and Renusol flat tile roofs.
  • Financial task rounding now respects the selected currency rather than defaulting to 1 decimal place.
  • Fixed Pro account financial setting rules that weren't working correctly for Admin role and added Owner role.
  • Updated MCS012 certificate used in the Structural task for Fastensol pan tile hooks.