Skip to main content

New in January 2026

Updates

  • copyAdded the option onto inverterclone inverters when using multiple of the same type. Stringing is copied by default.
  • New bulk update options for all DC isolators and cables inwithin the electrical task in bulktask.
  • MCS handover document added.
  • Signature date autocompletedis now auto-completed when e-signingsigning.
  • ImprovementsImproved tohow way GSE trays are speccedspecified relative to panel size. Easy PV will now always select the minimum compatible size. 
  • BirdblockerBirdBlocker clips are now specified based on panel frame width width.
  • Extra birdblockerBirdBlocker clips are only specified when requiredrequired.
  • UpdatingUpdated MCS012 certificate used in the Structural task for Fastensol pan tile hooks hooks.

Bug fixesFixes

  • EastFixed issues with east-west mounting and panel allocation fixes allocation.
  • CorrectionCorrected tothe system overview summary generated in the proposal when both string and hybrid inverterinverters selectedare selected.
  • FixingUpdated dropDNO downs not working when modal was open
  • Changedform rounding into DNO2 formsdecimal twoplaces 2dp so(e.g. 3.68kW68 iskW notno roundedlonger rounds to 3.7kW7 kW).
  • Fix toFixed incompatible pan tile hooks being specified for Fastensol and Renusol flat tile roofsroofs.
  • Financial task rounding basednow onrespects the selected currency rather than defaulting to 1dp1 decimal place.
  • Fix toFixed Pro account financial setting rules that weren't working correctly for Admin role and added Owner role.