Skip to main content
New in January 2026
Updates
- copy option on inverter
- update all cables in electrical task in bulk
- MCS handover document
- Signature date autocompleted when e-signing
- Improvements to way GSE trays are specced relative to panel size
- Birdblocker clips specified based on panel frame width
- Extra birdblocker clips only specified when required
- Updating MCS012 certificate for Fastensol pan tile hooks
-
Bug fixes
- East west mounting and panel allocation fixes
- Correction to system overview summary when string and hybrid inverter selected
- Fixing drop downs not working when modal was open
- Changed rounding in DNO forms two 2dp so 3.68kW is not rounded to 3.7kW
- Fix to incompatible pan tile hooks being specified for Fastensol and Renusol flat tile roofs
- Financial task rounding based on selected currency rather than to 1dp
- Fix to Pro account financial setting rules