New in January 2026 Updates Added the option to clone inverters when using multiple of the same type. Stringing is copied by default. New bulk update options for all DC isolators and cables within the electrical task. MCS handover document added. Signature date is now auto-completed when e-signing. Improved how GSE trays are specified relative to panel size . Easy PV will now always select the minimum compatible size .  BirdBlocker clips are now specified based on panel frame width . Extra BirdBlocker clips are only specified when required. Added way to easily set up payment after a free trial of Easy PV Pro.   One Fastensol L Bracket is now specced per hook for Fastensol Standing Seam systems, replacing the Fastensol cross connect.  Fixes Fixed issues with east-west mounting and panel allocation. Corrected the system overview summary generated in the proposal when both string and hybrid inverters are selected. Updated DNO form rounding to 2 decimal places (e.g. 3.68 kW no longer rounds to 3.7 kW). Fixed incompatible pan tile hooks being specified for Fastensol and Renusol flat tile roofs. Financial task rounding now respects the selected currency rather than defaulting to 1 decimal place. Fixed Pro account financial setting rules that weren't working correctly for Admin role and added Owner role. Updated MCS012 certificate used in the Structural task for Fastensol pan tile hooks.